ProcFlow
Initialising
PlatformHow it worksInteractive demoRecords & reviewBook a demo

Critical facility operations software.

For datacenters and critical facilities. Connect people, procedures, maintenance and operational records—from management oversight to technician field work.

People & assignments Maintenance & assets SOP · MOP · EOP
Illustrative work overview
Demo
0Active
0Done
0Review
Generator PM — UPS-03T. Bakker — Step 4/9
Demo
Annual Cooling InspectionA. Visser — Step 7/7
Review
LOTO — Rack PDU-11S. de Vries — Step 2/5
Demo
Scroll
People & assignments Guided procedure workflows Operational information Management review QR code asset linking Procedure authoring Configured work requirements SOP · MOP · EOP

Every feature earns its place

Procedures & field work.

Prepare SOPs, MOPs and EOPs with structured steps and configured requirements. Give technicians a field-focused way to access instructions.

Records & oversight.

Review work records, observations and outstanding actions in context. Assess the available records against your own operating and compliance requirements.

Maintenance & assets.

Organise work orders around equipment, priorities and named owners. Keep linked procedures accessible from the asset record.

People & responsibilities.

Make team roles, work assignments and shift coverage visible. A planned shift is not the same as recorded attendance or logged labour.

From prepared work to management review

01

Prepare the procedure

Build instructions in the procedure editor. Review imported material and requirements before making it available for field work.

02

Connect the work

Link procedures to asset records and make work ownership clear. Plan around the equipment and people involved.

03

Support field work and review

Give technicians access to the task and procedure context. Define the information managers need to review outcomes and follow-up.

09:41DEMO
AI Import
UPS_Maintenance_v4.pdf
PARSING9 STEPS FOUND
Verify PPE and permitparsed · p.2
Confirm bypass switch positionparsed · p.3
Initiate load transferparsed · p.3
Output voltage checkparsing…
Scan asset tag
UPS-03 · Hall B
ASSET ID · NL-AMS2-UPS-003
Generator PM — UPS-03
1 PROCEDURE MATCHED · 9 STEPS
Step 4 of 9
Initiate load transfer
Verify PPE and permit
T. BAKKER08:14
Confirm bypass switch position
T. BAKKER08:19
Initiate load transfer
IN PROGRESS08:23
Output voltage checkLOCKED
ILLUSTRATIVE WORKFLOW · NOT A LIVE RECORD

Explore an illustrative procedure workflow.

This interactive illustration uses fictional data. It is not a live execution, operating instruction, safety approval or proof of a completed record. Request a demo to review the actual app and your workflow.

Scan the asset

Illustrates access to procedures linked to an asset.

Confirm PPE

Illustrates configured procedure steps and requirements.

Capture evidence

Photo attached to the step, timestamped.

Digital LOTO

Illustrates a requirement prompt, not proof of physical isolation.

Sign off

Try the sample signature interaction; no real approval is created.

Audit report

Review the illustrative record summary.

09:41OFFLINE
Ready
Generator PM — UPS-03
NL-AMS2-UPS-003 · Hall B

Point the camera at the QR label on the rack.

NO SIGNAL REQUIRED

Step 1 — Verify PPE and work permitARC-FLASH CAT 2 · PERMIT #4471
  • Arc-rated coverall + face shield
  • Class 0 insulating gloves, tested
  • Permit signed by shift supervisor
NEXT STEP
Locked until this step is confirmed
Step 2 — Photograph breaker positionEVIDENCE REQUIRED
Tap capture
UPS-03 · 08:14:51 · 52.37N 4.89E

Illustration only: a photo can provide context for a procedure step. This demo does not save evidence or prove an immutable record.

Step 3 — Digital LOTOHAZARDOUS ENERGY
De-energisation required

Isolate UPS-03 output breaker, apply lock and tag, then verify zero voltage at the test points before continuing.

Hold to confirm

This step cannot be skipped. Skipping any other step requires a written reason — which is logged.

ISOLATION POINTS
Q1 · Output breakerLOCKED
Q2 · Bypass isolatorLOCKED
TP-4 · Zero-volt testAWAITING
Sign off — T. Bakker9 OF 9 STEPS COMPLETE
Draw your signature
HASHED ON SUBMIT
THIS SIGNATURE LOCKS
Steps confirmed9 / 9
Photo evidence4 attached
Deviations0
Execution complete
SYNCED · 09:47:12
PROCEDUREGEN-PM-004
ASSETUPS-03
TECHNICIANT. BAKKER
STEPS9 / 9
EVIDENCE4 PHOTOS
DEVIATIONS0
SHA-256a91f…7c2d
Audit report ready

Every step.
Every signature.
Every timestamp.

Keep the work record in context: the task, person, asset and information needed for review. Agree the records and approvals your site requires; software does not certify a facility or replace safe systems of work.

  • Timestamped step confirmations
  • Define step-level evidence requirements
  • Configured completion and review requirements
  • Discuss reporting and evidence requirements
  • Supervisor approval workflow for deviations
Execution log — GEN-PM-004UPS-03
PPE confirmedT. BAKKER
08:14
Bypass switch verifiedT. BAKKER
08:19
Load transfer initiatedT. BAKKER
08:23
Output voltage checkPENDING
—
Digital signaturePENDING
—
ILLUSTRATIVE RECORD · FICTIONAL DATA Export PDF
PeopleRoles, assignments and shift coverage
WorkProcedures and maintenance tasks
AssetsEquipment and linked instructions
RecordsContext for review and follow-up
A broader operational view

One product.
More than procedures.

ProcFlow brings people, procedures, maintenance and operational records into the same product. Evaluate the workflows your team needs rather than assuming every existing system can be replaced.

Operational areaWhat to explore in ProcFlow
People & responsibilitiesTeam roles, named work owners and shift scheduling
Procedures & field workSOP, MOP and EOP authoring, configured requirements and mobile access
Maintenance & assetsWork orders, equipment records and linked procedures
Records & oversightWork status, supporting information and management review
Already have a DCIM or BMS? Define the boundary.

ProcFlow focuses on people and operational work, not live building controls. Discuss any data exchange, connector or system-of-record requirements during your evaluation.

Asset contextWork ownershipIntegration requirements

Bring one workflow.
See where ProcFlow fits.

Explore the manager and technician experience with your team. Agree the scope, required records and success measures—including any time-registration and reporting requirements—before a pilot.